References Europe Switzerland Russia France - England Denmark Turkey Sweden England Spain France Scotland 302.7 km 189.7 km 100.0 km 78.8km 25.2 km 24.0 km 18.6 km 2.8 km 2.1 km 1.0 km 188.0 mi 117.9 mi 62.1 mi 48.9 mi 15.6 mi 15.0 mi 11.5 mi 1.7 mi 1.3 mi 0.7 mi Asia South Korea Hong Kong, China India Taiwan 600.6 km 92.2 km 67.0 km 39.2 km 372.9 mi 57.1 mi 41.6 mi 24.4 mi North America USA 75.1 km 46.5 mi South America Brazil Peru 123.2 km 0.3 km 76.5 mi 0.2 mi Africa South Africa 21.2 km 13.2 mi Oceania New Zealand Australia 8.3 km 10.2 km 5.2 mi 6.3 mi Total length 1'782.2 km 1106.4 mi Downloads Detailed information about LVT's 1'782.2 kms references 365 K Detailed information about LVT's 1106.4 mi references 283 K Selected Projects The new Gotthard rail link Country: Switzerland City: Link through the alps between Erstfeld and Bodio Line: Zurich - Milano Operating company: Swiss Federal Railways Length of track construction: 114 km (57 km double line) / 70.7 mi (35.4 mi double line) Axle load: 25 t (27.5 US t) Design velocity: 250 km/h (155 mph) Special feature: The Gotthard base tunnel is the longest railway tunnel in the world. Track construction takes place from September 2010 to 2015. Photo: ARGE Fahrbahn Transtec Gotthard / By courtesy of Alp Transit Gotthard AG and ARGE Fahrbahn Transtec Gotthard Durchmesserlinie Zurich (Cross-city Link) Country: Switzerland City: Zurich Operating company: Swiss Federal Railways / ZVV Length of track construction: 13 km (8.1 mi) Axle load: 25 t (27.5 US t) Special feature: All various LVT support types (Standard, HA, Traffic, S&C) were installed, even LVT standard on floating slabs. Taiwan - Nangang Extension Country: Taiwan City: Taipeh Operating company: THSRC Length of track construction: 13.0 km (8.0 mi) Axle load: 18 t (19.8 US t) Special feature: The concrete blocks were produced in Taiwan with a direct demoulding machine supplied by Sonneville. New York - Line 7 Extension Country: USA City: New York Operating company: NYCTA Length of track construction: 4.8 km (3.0 mi) Axle load: 19 t (21 US t) Marmaray Tunnel Country: Turkey City: Istanbul Operating company: TCCD Length of track construction: 25.2 km (15.5 mi) Axle load: 25 t (27.5 US t) Special feature: The Marmaray BC1 tunnel is the deepest immersed tunnel in the world. Canal Tunnel London Country: England City: London Operating company: Network Rail Length of track construction: 1.8 km (1.1 mi) Axle load: 15 t (16.5 US t) Special feature: The entire tunnel was equipped with LVT HA supports. Inceon Airport Phase 2 Country: Korea City: Seoul Line: Gimpo-Seoul Operating company: AREX Length of track construction: 28 km (17.4 mi) Design velocity: 120 km/h (75 mph) Special feature: The LVT installation took place from February to July 2009. The contractor worked in three shifts in five divided sections to meet the client's time requirements. East London Line Country: England City: London Operating company: TfL Length of track construction: 10 km (6.2 mi) Axle load: 15 t (16 US t) Special feature: The LVT system was installed in various environment conditions: in tunnel, at grade, at viaducts/bridges as well as in switches and crossings. Citytunnel Malmö Country: Sweden City: Malmö Operating company: Banverket Length of track construction: 12 km (7.5 mi) Axle load: 19 t (21 US t) Design velocity: 160 km/h (100 mph) Special feature: With the installation of the LVT high attenuation (LVT HA) system, the high requirements on vibration attenuation for this project could be fulfilled. Low vibration track (LVT)