ReferencesEuropeSwitzerlandRussiaFrance - EnglandDenmarkTurkeySwedenEnglandSpainFranceScotland302.7 km189.7 km100.0 km78.8km25.2 km24.0 km18.6 km2.8 km2.1 km1.0 km188.0 mi117.7 mi62.1 mi48.9 mi15.6 mi15.0 mi11.5 mi1.7 mi1.3 mi0.7 miAsiaSouth KoreaHong Kong, ChinaIndiaTaiwan600.6 km92.2 km67.0 km39.2 km372.9 mi57.1 mi41.6 mi24.4 miNorth AmericaUSA99.3 km61.5 miSouth AmericaBrazilPeru123.2 km0.3 km76.5 mi0.2 miAfricaSouth Africa21.2 km13.2 miOceaniaNew ZealandAustralia8.3 km10.2 km5.2 mi6.3 miTotal length 1'806.4 km1'121.4 mi Downloads Detailed information about LVT's 1'806.4 kms references 365 K Detailed information about LVT's 1'121.4 mi references 283 K Selected Projects The new Gotthard rail link Country: SwitzerlandCity: Link through the alps between Erstfeld and BodioLine: Zurich - MilanoOperating company: Swiss Federal RailwaysLength of track construction: 114 km (57 km double line) / 70.7 mi (35.4 mi double line)Axle load: 25 t (27.5 US t)Design velocity: 250 km/h (155 mph)Special feature: The Gotthard base tunnel is the longest railway tunnel in the world. Track construction takes place from September 2010 to 2015.Photo: ARGE Fahrbahn Transtec Gotthard / By courtesy of Alp Transit Gotthard AG and ARGE Fahrbahn Transtec Gotthard Durchmesserlinie Zurich (Cross-city Link) Country: SwitzerlandCity: ZurichOperating company: Swiss Federal Railways / ZVVLength of track construction: 13 km (8.1 mi)Axle load: 25 t (27.5 US t)Special feature: All various LVT support types (Standard, HA, Traffic, S&C) were installed, even LVT standard on floating slabs. Taiwan - Nangang Extension Country: TaiwanCity: TaipehOperating company: THSRCLength of track construction: 13.0 km (8.0 mi)Axle load: 18 t (19.8 US t)Special feature: The concrete blocks were produced in Taiwan with a direct demoulding machine supplied by Sonneville. New York - Line 7 Extension Country: USACity: New YorkOperating company: NYCTALength of track construction: 4.8 km (3.0 mi)Axle load: 19 t (21 US t) Marmaray Tunnel Country: TurkeyCity: IstanbulOperating company: TCCDLength of track construction: 25.2 km (15.5 mi)Axle load: 25 t (27.5 US t)Special feature: The Marmaray BC1 tunnel is the deepest immersed tunnel in the world. Canal Tunnel London Country: EnglandCity: LondonOperating company: Network RailLength of track construction: 1.8 km (1.1 mi)Axle load: 15 t (16.5 US t)Special feature: The entire tunnel was equipped with LVT HA supports. Inceon Airport Phase 2 Country: KoreaCity: SeoulLine: Gimpo-SeoulOperating company: AREXLength of track construction: 28 km (17.4 mi)Design velocity: 120 km/h (75 mph)Special feature: The LVT installation took place from February to July 2009. The contractor worked in three shifts in five divided sections to meet the client's time requirements. East London Line Country: EnglandCity: LondonOperating company: TfLLength of track construction: 10 km (6.2 mi)Axle load: 15 t (16 US t)Special feature: The LVT system was installed in various environment conditions: in tunnel, at grade, at viaducts/bridges as well as in switches and crossings. Citytunnel Malmö Country: SwedenCity: MalmöOperating company: BanverketLength of track construction: 12 km (7.5 mi)Axle load: 19 t (21 US t)Design velocity: 160 km/h (100 mph)Special feature: With the installation of the LVT high attenuation (LVT HA) system, the high requirements on vibration attenuation for this project could be fulfilled. Low vibration track (LVT)